Skip to content
Construction financing guide

Best Business Loans for Construction Companies 2026

Contractors pay crews, suppliers and subcontractors weeks or months before a client pays the invoice, and retainage can hold back a slice of every payment until the job closes. This guide compares financing built for that gap, from invoice factoring and lines of credit to equipment loans for machines that earn on the next job.

By the Same Day Business Loans Online editorial team

  • Free to compare
  • Soft check to browse
  • No obligation
Open pay applications $84,500 Billed and waiting to be paid
Funding from24 hrs
01 Key takeaways

Construction loan basics: what to know before you borrow

The short version, for contractors who want the answer first.

  1. Expect to wait for your money.

    Contractors often wait 60 to 120 days after finishing work to be paid, while labor and materials are due much sooner.

  2. Retainage ties up real cash.

    Owners commonly hold back 5 to 10 percent of each payment until completion, which is $50,000 to $100,000 on a $1 million job.

  3. Use receivables as a funding source.

    Invoice factoring can advance a large share of an approved progress invoice, often 70 to 85 percent, instead of waiting for the owner.

  4. Keep equipment loans separate from job funding.

    A loan secured by the machine suits excavators and trucks, while working capital or a line of credit suits payroll and materials.

02 Construction cash flow management

Construction cash flow management: work done, money still owed

A job can be on schedule and under budget while the account runs dry, because costs are paid as they happen and revenue follows approvals, inspections and retainage rules.

1

Win and mobilize

Permits, deposits, site setup and the first material order are paid before the first progress payment is approved.

Weeks before billing
2

Pay crews and subs

Payroll goes out weekly or biweekly, and subcontractors often want payment within a few weeks of the work.

Weekly or biweekly
3

Buy materials

Lumber, steel, concrete and fixtures are bought on supplier terms that can be shorter than the owner's payment window.

15 to 45 days
4

Bill and wait

A pay application is submitted, reviewed and approved, then the owner or general contractor pays.

30 to 120 days
5

Retainage release

The held back percentage is released only after final completion and sign off.

At project close

A 13 week project picture: profitable job, short in week 9

$0K $10K $20K $30K $40K W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 $0 Gap near $12K in week 9 Running cash balance

Swipe the chart sideways to see all 13 weeks.

Cash in Cash out Running balance

Illustrative example, not measured data. Progress payments land in only five weeks while payroll and materials go out nearly every week, so a healthy job can still leave the account thin between approvals.

Job profit and cash are not the same thing

Profit view compared with cash view for a contractor
Job profit view Cash view
What it measures Contract value minus the cost of the job What actually reached or left your bank account
Progress billing Counts work as earned when it is completed Counts only when the owner pays the approved application
Retainage Part of the earned contract value Held back and unavailable until the job closes
Materials Cost recognized as they are used Paid in full when the supplier invoice is due
Best question it answers Is this job making money? Can we cover payroll before the next payment arrives?

Six signs your contracting cash flow needs attention

Payroll depends on the next owner payment

If wages only clear when one client pays, a single late approval becomes a crisis.

Suppliers have started to ask for cash on delivery

Losing trade terms raises the cash you need before each job.

You take on a new job to fund the last one

Using fresh deposits to cover old costs hides an underlying gap and grows the risk.

Retainage is piling up across jobs

Several closed to completion jobs holding 5 to 10 percent can lock up a large share of your working cash.

A change order would stall the project

Extra work approved on paper but unpaid can drain a thin account.

Equipment repairs come out of payroll money

A broken machine should have its own reserve or financing.

Build a 13 week forecast for your jobs in five steps

  1. Start with the real bank balance

    Use the cash you hold today, not the contract value of work in progress.

  2. List every pay application

    Enter the amount, the date you will bill and the realistic day it will be paid.

  3. Add payroll, subs and materials by week

    Place each cost on the week it is actually due, including payroll taxes and insurance.

  4. Hold retainage out of the forecast

    Treat held back amounts as unavailable until the completion date.

  5. Update it with every approval

    Replace estimates with actual payments and slide the forecast forward one week.

Contractors in safety gear talking on an active job site
Photo: Unsplash
03 Seasonal cash flow for contractors

Construction cash flow through the year: four stretches of the work cycle

Weather, permitting and budget cycles shape when crews are busy and when owners pay. The meters show how tight cash usually feels in each stretch of the work cycle.

1 Slow

January to March: slow ground

Cold or wet weather delays outdoor work in many regions while insurance, equipment payments and office costs continue. Estimating and permitting for the next season often start here.

2 Mobilizing

April to June: ramp up

Crews and equipment return, and mobilization costs rise before the first progress payments arrive. This is when working capital is often needed most.

3 Peak billing

July to September: full production

Long days bring heavy billing, though payments still trail the work. Collections from spring jobs help rebuild reserves.

4 Closing out

October to December: closing out

Jobs race to finish before winter and retainage release becomes the main cash question. Cold weather can slow late projects and their final payments.

04 Construction loans by situation

Construction loans for new firms, bad credit, slow paying clients and more

Choose the scenario closest to your jobs, then compare offers built for it.

New contracting company

Fewer than two years of records limits the options and raises the price. Equipment financing and invoice factoring look at the machine or the client, so they can be easier to qualify for than a bank loan.

Slow paying general contractors

When a GC pays in 60 to 90 days, factoring or a line of credit can bridge the wait. Check that the funder works with your client and understands pay applications.

Bonding and project deposits

Large public jobs often need a bond and an upfront deposit. Working capital or a line of credit can cover the cash while the surety is arranged.

Equipment purchase or upgrade

Excavators, skid steers, trucks and tools can usually be financed with the equipment as security. Get a written dealer quote before comparing down payments and terms.

Retainage cash trap

If held back amounts across several jobs are strangling cash, a line of credit that you repay on release can ease the squeeze without selling work cheaply.

Bad credit contractors

Lower scores narrow choices and raise cost, but receivables based funding and secured equipment loans may remain open. Compare total dollars repaid.

05 Types of construction loans

Types of construction business loans compared

See which product fits payroll gaps, equipment, retainage or a larger expansion, and how fast and costly each one usually is.

Construction loan types at a glance
Loan type Best for Speed Typical cost
Invoice factoring Waiting on progress payments Days Moderate to higher
Equipment financing Machines, trucks and tools Days to weeks Moderate
Business lines of credit Payroll and materials between draws Days Moderate
Working capital loans Job mobilization costs Same day to days Higher
Online term loans A yard, shop or fleet upgrade Days to weeks Moderate
SBA 7(a) loans Growth and acquisitions Weeks to months Usually lower

Cost level is a rough guide for construction borrowers and depends on your credit, sales and the lender.

Invoice factoring

Against unpaid invoices
Days to a week Costs vary widely

An approved progress invoice is advanced to you, often 70 to 85 percent upfront, with the balance paid when the owner settles. Check the fee schedule and who handles collection.

Equipment financing

Up to the asset value
Days to weeks The asset secures the loan

The excavator, truck or loader secures its own loan, so you keep job cash for labor and materials. Ask about the down payment and what happens on early payoff.

Business lines of credit

Revolving limit
Days Pay only for what you draw

A revolving limit lets you draw for payroll or materials between draws and repay when the owner pays. You pay interest only on what you use.

Working capital loans

Often $5K to $500K
Days Short repayment windows

Short term funds can cover mobilization, permits and deposits on a new job. Repayment is often daily or weekly, so match it to when invoices clear.

Online term loans

Often $5K to $500K
Same day to a few days Fast, but priced for speed

A lump sum with fixed payments suits a larger one time purchase such as a yard, a shop or a small fleet.

SBA 7(a) loans

Up to $5M
Weeks to months Lower cost, longer terms

Longer terms and lower rates for expansion, refinancing or buying another firm, with a slower, more document heavy process.

Line of credit or invoice factoring: which fits a contractor?

Business line of credit

How it works
You draw from a set limit and repay when your clients pay
Best for
Ongoing payroll and materials across several jobs
Cost shape
Interest on the amount drawn, plus possible fees
Risk to watch
Using it for long lived assets and never clearing the balance
Speed
Instant draws once the line is open

Invoice factoring

How it works
You sell an approved invoice and receive an advance, then the rest less a fee
Best for
One or two large pay applications with slow owners
Cost shape
A fee on each invoice that grows the longer it is unpaid
Risk to watch
Client contact, fee creep and approval limits on each owner
Speed
Often within a day or two of invoice approval
06 Construction loan costs

How much does a construction loan cost?

Illustrations only, not quotes. Two contractor offers can look alike until each is converted into the total dollars repaid.

Equipment loan example $145,990

Borrow $120,000 over 5 years at 8 percent APR and the payment is about $2,433 a month, $145,990 in total.

Invoice factoring example $1,250 fee

A $50,000 progress invoice advanced at 80 percent releases $40,000 now. A 2.5 percent fee on the full invoice costs $1,250 for the first month, and the fee grows the longer the owner takes to pay.

  • The full amount you will repay on the construction loan and the date of each payment
  • How factoring fees grow with each extra week the owner takes to pay
  • Whether the funder collects directly from your client or only advances
  • Any lien on equipment, receivables or other business assets
  • That nobody asked you for a fee before approving your construction application
07 Eligibility and requirements

Construction loan requirements and eligibility

Treat these ranges as a general guide, since each construction lender sets its own rules. Contracts, pay applications and clean statements are the quickest way to shorten a review.

SBA loans

Credit
Good personal credit, often 680 or higher
Time in business
2 years or more preferred
Revenue
Steady profit and strong backlog

Equipment financing

Credit
Often from the mid 500s, varies widely
Time in business
6 months or more
Revenue
Regular revenue and a dealer quote

Invoice factoring

Credit
Client credit often matters more than yours
Time in business
Often no minimum
Revenue
Invoices from creditworthy owners

Line of credit

Credit
Often from the low 600s
Time in business
1 year or more
Revenue
Steady monthly deposits

Documents needed for a construction loan

  • Three to six months of business bank statements
  • A government issued ID for every owner
  • Signed contracts and a current work in progress schedule
  • Accounts receivable aging report and recent pay applications
  • A dealer quote or invoice for any equipment you plan to buy
  • Your license, insurance certificate and a bond letter if you carry one

How to get a construction loan in four steps

  1. Say what the money is for

    Tell lenders whether it covers payroll, a new machine or slow invoices. Each need points to a different product.

  2. See who will lend to you

    Review lenders that work with contractors, along with the cost and speed of each.

  3. Compare written offers

    Line up the total repaid, fee schedules and payment timing, then ask about early payoff and lien terms.

  4. Sign and fund

    Online products can fund within a few days, while SBA and bank loans take longer.

08 Construction equipment and project financing

Construction equipment and project financing: what you can fund

Heavy machines, trucks and job costs can each be funded in different ways. Here are the items contractors most often finance, followed by the trade offs of borrowing.

Excavators and loaders

Track and wheel machines that dig, lift and move material, with the unit itself as security.

Dump trucks and trailers

Haul trucks, flatbeds and equipment trailers that move crews and material between sites.

Skid steers and compact gear

Smaller machines that win residential and renovation work and keep crews productive.

Power tools and scaffolding

Saws, lasers, scaffolds and lifts that crews use every day and replace on a cycle.

Job site mobilization

Temporary power, fencing, portable toilets and storage needed before the first payment.

Materials and supplier orders

Bulk lumber, steel, drywall and fixtures bought early to hold price or meet a start date.

Safety and compliance gear

Harnesses, trench boxes and signage required to meet inspection and insurance rules.

Software and estimating

Project management, takeoff and billing tools that speed up pay applications.

Advantages

  • Bridges the wait for owner and general contractor payments
  • Lets you start a new job without draining reserves
  • Equipment can secure its own loan
  • Receivables based funding grows with your billing
  • Options exist for firms with lower credit scores
  • Can reduce reliance on tight supplier terms

Disadvantages

  • Factoring and advance fees can add up on slow paying clients
  • Short term construction products can cost more than a bank loan
  • Equipment or receivables may be pledged as collateral
  • A personal guarantee is common
  • Large jobs may still need a bond on top of financing
  • Daily payments can strain a thin week between approvals
09 Common borrowing mistakes

Common construction loan mistakes to avoid

  1. Using retainage as spending money

    Held back funds are not yours until the job closes. Plan as if they will arrive late.

  2. Borrowing short for a long machine

    A six month advance for an excavator that lasts years makes payments heavier than the new work. Match the term to the asset.

  3. Ignoring the cost of waiting

    Factoring fees usually rise with each extra week. Ask how the price changes if the owner is late.

  4. Taking on a job you cannot float

    A big contract with 90 day terms can stretch cash beyond your limit even if it is profitable.

  5. Skipping the lien check

    A blanket lien on all assets can block later equipment financing. Read what is pledged before you sign.

10 Construction loan glossary

Construction loan terms and definitions

Lenders and owners use words that sound alike but mean different things. These are the ones contractors meet most often.

Retainage
A percentage, commonly 5 to 10 percent, held back from each payment until the project is complete.
Pay application
A formal request for payment that lists the work finished so far. Approval can take weeks.
Progress billing
Invoicing in stages as the work advances, instead of one bill at the end.
Invoice factoring
Selling an approved invoice to a funder for an upfront advance, then the balance less a fee.
Surety bond
A guarantee from a third party that you will complete the job, often required on public work.
Change order
A written change to the scope or price of a contract, which should be approved before work begins.
Mechanic's lien
A legal claim on a property by a contractor or supplier that has not been paid.
Mobilization
The upfront cost of getting crews, equipment and temporary facilities to a site.
Factor rate
A multiplier, such as 1.20, applied to the amount advanced. A $50,000 advance at 1.20 means repaying $60,000. It is a total cost, not a yearly rate.
APR
The yearly cost of borrowing with interest and some fees included, which lets you compare an equipment loan with a line of credit on one scale.
11 Construction loan FAQs

Construction business loan FAQs

Quick answers to the questions contractors ask most before they borrow.

How long do contractors wait to get paid?

Many contractors wait 60 to 120 days after finishing work, depending on the owner, the general contractor and the approval process. That wait is why working capital and factoring are so common in the trade.

What is retainage and how does it affect cash flow?

Retainage is a percentage of each payment, commonly 5 to 10 percent, that is held until the project is complete. On a $1 million job that can be $50,000 to $100,000 that you cannot spend.

Can I get a construction loan with bad credit?

It is possible. Invoice factoring looks mainly at your client, and equipment loans look at the machine, so both can be open to lower scores. Expect higher cost on construction loans and compare the total repaid.

How does invoice factoring work for contractors?

A funder advances a large share of an approved pay application, often 70 to 85 percent, then pays the rest less a fee when the owner pays. Fees often rise the longer the invoice stays unpaid.

What is the best loan for buying construction equipment?

Equipment financing is usually the best fit, because the machine secures the loan and keeps job cash free. Compare down payment, term and early payoff rules.

Can a new contracting company get financing?

Yes, though choices are narrower. Lenders look at your experience, credit and any signed contracts. Equipment financing and receivables based funding are common first steps.

Do I need a bond to get a business loan?

No, a bond and a loan are separate. Public and large private jobs often require a surety bond, and working capital can help cover the cash needed to arrange it.

How fast can a contractor get funding?

Online lenders and factoring firms can fund within a day or a few days. Bank and SBA loans take weeks to months but often cost less.

Can I use a loan to pay subcontractors?

Working capital and lines of credit are commonly used for payroll, subcontractors and materials. Make sure the repayment schedule fits when your owners pay you.

Why do profitable contractors run out of cash?

Costs are paid as work happens while revenue follows approvals, inspections and retainage release. A job can be profitable on paper and still leave the account empty between payments.

What is a 13 week cash flow forecast for a contractor?

Map expected receipts and payments across the next 13 weeks from your actual bank balance, and update it every week. For a contractor it shows which pay application or payroll week will strain the account.

Will comparing construction lenders affect my credit score?

Comparing offers here is a soft check and leaves your score alone. A hard inquiry only follows if you accept an offer and apply with a lender.

Compare loans for other industries

Find the right capital for your construction business in minutes

See your construction options in a few minutes, then weigh each written offer by total cost. Browsing this site never touches your credit.

  • Free to compare
  • Soft check to browse
  • No obligation
Compare construction lenders